TOHID IRANIAN SCHOOL PROJECT (DUBAI, UAE)
Construction of 3-storey Tohid Iranian School in Dubai
Commencement Date: March 28, 2005
Completion Date: December 31, 2006
Facts & Figures
Employer: Directorate of Iranian Schools in UAE
Engineer: Farayand Architectural Engineering Consultancy
Contractor: TAV Construction - Seidco JV
Total Area: 28,000 m²
Location: plot no. 354-1750 Al Goze First, Dubai, UAE
Construction Period: 21 months
In 2005, the Company signed a contract with Directorate of Iranian Schools in UAE to build and maintain the Tohid school facilities. Covering an area of 28,000 m², the scope of the project included structural, civil and finishing works, as well as all mechanical engineering and plumbing (MEP) specifications and drawings. The engineer in the lump sum turn-key endeavor was Farayand Architectural Engineering Consultancy and a TAV Construction - SEIDCO joint venture served as a contractor.
Work on the three-storey structure began in March of 2005 and was completed on schedule by the end of 2006. The school is eloquently accented by a large triune canvas awning that extends across the playground, making it a landmark in Dubai’s growing network of private schools. Reminiscent of the nomadic tents of the region’s forefathers, this creative architectural design is emblematic of the need for today’s students to change with the times.