NEW TRIPOLI INTERNATIONAL AIRPORT TERMINAL BUILDINGS (LIBYA)
THE NEW IMPRESSIVE GATEWAY TO AFRICA...

Construction of New Tripoli International Airport Terminal Buildings Libya

Facts & Figures

Terminal Design Capacity: 20 million passengers per year
Total Terminal Area: 350,000 m²
Boarding Bridges: 32 fixed + 64 mobile
Check-in Islands: 8
Check-in Counters: 160 units (cute workstations)
Baggage Carousels: 4 domestic + 8 international
Travelators: 2300 m
Escalators: 26 units
Elevators: 48 units
Total Construction Period: 24 months

Tripoli Airport Terminal Building Construction Project has been awarded to Odebrecht – TAV – CCC Joint Venture, as of September 2007. This monumental project consist of two terminal building construction, having an area of 175,000 m² each, with 48 lifts, 26 elevators, 160 check-in counters, 12 baggage handling carrousels and 32 fixed and 64 mobile passenger boarding bridges.

The passenger capacity of the new twin terminals will be 20,000,000 passenger / year. The project is scheduled to be finalized on September 2009.

Mused by the sunset on a sea of sand, dunes on the horizon with soft curves; the 130,000 m² steel roof with recapping curves wants to slide and come to rest on the concrete. The silk screening on the façade glazing, together with the deep roof overhangs ensures that the terminal interior has maximum protection from harsh light. The inclined façades emphasize the sense of a generous interior space and reinforce the acoustical comfort. Apart being one of the most demanding projects in the world today, tight schedule and need for application of fast construction, requires a highly motivated and dynamic team. Here steps in TAV Construction.

 
tripoli01 tripoli02 tripoli03 tripoli04
 
 
 
 
  Interactive Map Site Map   TAV Tepe Akfen Investment Construction and Operation JSC Terms and Conditions